Alstom at European Wind Energy Association (EWEA) 2011

Press Contacts

Visit our media section and follow the link "Press contacts"

Alstom at European Wind Energy Association (EWEA) 2011, Brussels, Belgium, 14th 17th March 2011 

A long-lasting business partner of the European energy market, Alstom delivers higher yields in wind energy thanks to our market-leading technologies. With 30 years of experience in wind, we are ready to participate in the emerging and booming European wind power market.

Alstom Higher Yield Onshore  

Having installed or currently installing more than 2,100 wind turbines in more than 110 wind farms, corresponding to a total capacity of more than 2,700 MW around the world, Alstom will offer higher yield through the upgrade of our ECO 100 turbine platform.

Alstom Offshore Solutions 

A new offshore platform is under development to offer a 6MW turbine with direct-drive technology and ALSTOM PURE TORQUE  design for higher reliability. The prototype phase has started and will run through 2011 and 2012, followed by a pre-series in 2013 and series production in 2014.

ALSTOM PURE TORQUE Design for higher reliability 

All Alstoms wind products feature the companys ALSTOM PURE TORQUE concept, a unique mechanical design concept which protects the drive train from deflection loads to ensure a higher reliability.

 

Alstoms experts shared their expertise at EWEA 2011.

Scientific Session
Tuesday, 15th March 2011
Active and Passive Load Alleviation


Wind Gusts Detection and Load Alleviation Using Artificial Neural Networks Assisted Control
Carlo Enrico Carcangiu, Alstom 

Scientific Session
Tuesday, 15th March 2011
Reliability and Operation and Maintenance

Model-Based Fault Detection and Isolation of Wind Turbines, A Field Data Approach
Pep Luis-Negre, Alstom 

Scientific Session
Wednesday, 16th March 2011
Innovative Concept and Support Structures for Offshore

Wind Turbine Tower Load Reduction Using Passive and Semi Active Dampers
Arturo Rodriguez Tsouroukdissian, Alstom 

Grids Session
Wednesday, 16th March 2011
Towards Wind Turbine Supporting Power Systems

Integrated Approach to Comply with Grid Code Requirements for Large Offshore Wind Farms
Marc Sala, Alstom 

Plenary and Panel Session
Wednesday, 16th March 2011

Operational Modal Analysis on Multi MW Wind Turbines Experimental Campaign
Carlo Enrico Carcangiu, Alstom 

Effect of Design Tolerances on the Behaviour of the Structural Bolted Joints
Nicolás Velázquez, Alstom 

Extending The Applicability of Wind Turbines Using a Platform Strategy
Alexis de Beaumont, Alstom  

Technology Session
Thursday, 17th March 2011
New Control Concepts

Facing Extreme Wind Conditions with Lidar Assisted Control
Isaac Pineda, Alstom 

Alstom is fully committed to developing wind power into an increasingly competitive source of energy.

Read More