Alstom wins contracts for fast turnaround supply to power project in Ghana

Press Contacts

Visit our media section and follow the link "Press contacts"

Alstom has won a 48 million euro contract to supply two GT11N2 gas turbines with two TOPAIR air-cooled turbogenerators and auxiliaries for a new 230 MW power plant at Kpone, near Tema in south-east Ghana.

Drawing on stock equipment supply, Alstom will be able to deliver the first unit in less than 12 months.

The turbines feature a low emission combustion system and are capable of operating with either natural gas or diesel oil. 

Should you have any media inquiries about this press release, do not hesitate to contact our team.

Your press contacts