Alstom awarded a contract to supply EEBs first 500 kV substation in Colombia

Press Contacts

Visit our media section and follow the link "Press contacts"

Alstom Grid has been awarded a 23 million contract to supply the first 500 kV substation for Empresa de Energía de Bogotá (EEB).  The substation will be located at Gachancipa, 30 km north from Bogota, capital city of Colombia. It will connect the Hydro Sogamoso power plant to Bogota, improving and increasing the reliability of the citys energy system. The project is due to be completed by mid-2017. 

The substation is essential to support the national program of energy improvement in Colombia, which focuses on projects that will reduce power loss, meet the environmental standards of the country and also guarantee that the substation operates at optimum efficiency. 

Alstom will deliver the 500 kV turnkey substation, inclusive of design, civil works construction, erection and commissioning. Part of the solution offered is Alstoms air-insulated switchgear comprising live tank circuit breakers, disconnectors and instrument transformers. The equipment has a proven track record of its performance under high altitude, heavy pollution and seismic zone restrictions.  

Alstom and EEB have been working together over the last 15 years, developing several turnkey substations in Colombia. This is one of the major projects that Alstom Grid Colombia is participating in. Its extremely gratifying to be part of EEB contract, especially as it represents an important milestone to the region. Securing this contract demonstrates the customers continued confidence in Alstom, says Juan Jorge Celis, Country President of Alstom Colombia. 

Present in Colombia for over 60 years, Alstom has strong capabilities in engineering, manufacturing, project management and supply of products and solutions for infrastructure. Alstom Colombia is responsible for projects of turnkey substations and equipment to important power plants in the country, such as El Quimbo and Ituango. 

About Alstom

Alstom is a global leader in the world of power generation, power transmission and rail infrastructure and sets the benchmark for innovative and environmentally friendly technologies. Alstom builds the fastest train and the highest capacity automated metro in the world, provides turnkey integrated power plant solutions and associated services for a wide variety of energy sources, including hydro, nuclear, gas, coal and wind, and it offers a wide range of solutions for power transmission, with a focus on smart grids. The Group employs 93,000 people in around 100 countries. It had sales of over 20 billion and booked 21.5 billion in orders in 2013/14.

 

Alstom Grid has one clear vision: to develop innovative solutions for a flexible, reliable, affordable and sustainable electrical grid, everywhere. We design, manufacture, install and service the power transmission and distribution products and systems that empower the planets low carbon economy... for now and for the future.

Alstom Grid has over 130 years experience and ranks among the top three in the electrical transmission sector with an annual sales turnover of 3.8 billion. Alstom Grids 17,000 employees are spread across 87 manufacturing and engineering sites worldwide and have one common mission: be our customers trusted partner, from the source to the city.

We are energising a smarter world with Alstom.